Showing posts with label knitting. Show all posts
Showing posts with label knitting. Show all posts

Thursday, 19 January 2023

More than half-way through January





I've finished the socks that have been on the needles for over a year. I've deliberately made the legs short so they don't cut in, as the last ones I made gave me deep lines round my legs, and swollen ankles.




I've also made a start (see left) on a counted cross-stitch embroidery that I've had for at least 10 years - I bought it as one of several when a shop in Harrogate was closing down. The pic below is from the front of the packet and shows what it will eventually look like. I did 2 very similar ones many years ago which are now at the flat, so I'm hoping I can find a matching frame.







The cold weather has prevented us going to Poole this week as various roads are closed or restricted, so we'll have to save that pleasure until next month.

Monday, 22 November 2021

Winter Draw(er)s On

 ...yes, I know that's an old chestnut but it still raises a smile. 



As often seems to be the case, it has been some months since the last post, and we've begun to get out a bit more; we've both had our 3rd 'booster' dose of Pfizer. We've been to the flat a couple of times, and we went to The Castleman again for Mr Bufo's birthday. 





This was the breakfast table 









And this was the lounge the night before.







We've also been to Eastbourne - hence the sunrise in the top picture. 


Now we're making plans for Christmas and the year will soon be over - we already have some appointments in on the new calendar for next year!




Still knitting and crocheting, too - a blanket (this is the centre section, there is more to come)...










...socks...







...and I've made a Christmas cake, which has now had 3 (of the 6) weekly feeds of brandy!






   

Saturday, 12 June 2021

And Suddenly it's Summer!

 ...and once again we are waiting to hear whether restrictions are to be lifted further next week or not. In the meantime the French Open is nearly over - which means Wimbledon cannot be far behind, and the garden is rather untidily full of flowers. 


The peony in the picture above has been annoying me for some years, as it would bud, and then drop, so I said it could go. It must have heard, in the way these things do, because this year it had four big buds, once of which was in full flower when the scaffolding from our roof replacement came down...and knocked the stem a bit. It might have recovered, but I decided to cut the stem and add it to one of the vases of the latest delivery from Bloom and Wild. 


We are both fully vaccinated now, and have had a wonderful night away at the Castleman Hotel in Chettle, Dorset. This had changed hands since we were last able to get there - 2 years ago! - but the ambience and the food were still of exceptionally high standard, and it was such a treat for us not to have to think about preparing or clearing up a meal. The room we were given had a four-poster bed, which was a bit high. In fact anyone shorter than me would have needed a step to get in, and getting out (inevitably) in the middle of the night, was a bit haphazard, so next time we go, I think we'll ask for a different room.



 

I am still knitting - a top-down rust-red cardigan at the moment, though also trying to finish a conventionally  structured black one while the days are bright, as it is impossible to see the stitches properly in winter or artificial light. A few days ago I had to drop down about 25 rows to correct (with a crochet hook) the two purls that should have been knits on the body of the garment! 




We also have a new dishwasher! Many years ago on here I recorded that I was unhappy with the first dishwasher we had, and thought the problem was the detergent. 10 years on, we have replaced it as it was just pumping and not draining properly, and find that the new one (which has the added benefit of popping open when it has finished) doesn't smell of detergent when it has completed the cycle. This makes us think that the old one had never drained/rinsed properly, and that we've been exposed to dishwasher detergent in our diet for all that time. It was the first one we had, how were we to know that it wasn't normal to get the detergent smell?




The garden is looking good, if a bit wild. The strawberries are ripening, the blackcurrants are setting...and the forecasters tell us that summer is here!


Wednesday, 30 January 2019

Snow or Snowdrops?




The snowdrops are nearly out ... but we are threatened with the real thing tomorrow. Except we shall be on our way between here and the flat in Poole, via Yapp Brothers Wine Merchants in Mere, and the Udder Farm Shop, where we are booked for lunch. So we'll need to eat fairly quickly and get on our way, before the weather closes in at about 1.30!



The Scarf I started knitting before Christmas, with yarn bought last August, is nearly finished, and ready for handing over to its future owner in March when I see her.

Sunday, 13 May 2018

Catch-up on the knitting

Time for another knitting post. I've been getting on with several things over the last few months, including finally finishing something that has been a bit of a millstone, and starting a fun blanket. Meanwhile there are always socks, and I've embarked on my first top-down cardigan.

The blanket is a Knit-Along (KAL) that started at the beginning of January, though I only got going at the end of Jan- but I've caught up now. Patterns are released every 1, 8, 15, and 22 of each month, leaving the extra days at the end of the month for sewing up the four squares produced into a larger square. At the end of each quarter we get the instructions for sewing the quarter's 3 larger squares into a strip. 







So far I have one strip




















plus one month's large square









and a couple of weeks' squares from this month 














The plan is to end up with 48 squares and 'weeks' 49 and 50 will be the final assembly and border.



The 'millstone' is a cardigan for Mr Bufo that I started two years ago. The pattern was not well-written - to start with, the opening of the pattern stated it was 'Small, Medium and Large' But the actual instructions were for 4 sizes. 
I had a long gap when I had put it away for the summer, as being too hot to do in the warmer months, and when I came back to it in the autumn of 2016 I couldn't find the bag of new balls of wool! So I did other things that winter, and it wasn't until sometime last year I found the bag with the extra in. 
Then when I thought I'd nearly finished I discovered that the cuffs on the sleeves I had knitted according to pattern would not go over Mr B's hands, so I ended up picking up the stitches from the armholes and knitting down.
But now it is done, it doesn't look too bad, and I think he's quite pleased with it!




And then we come to socks ...




I bought 2 balls of sock yarn in Lille at Christmas
















... and knitted up the red and blue for Mr B














Then I made a start on the purple and grey for me, but haven't got very far yet.

















And I keep being tempted/distracted by other things, like this Sirdar Colourwheel














...with which I've started the top-down cardigan 







So that's most of it - I've done a few shawls and other bits and pieces along the way, of course! 

Wednesday, 5 October 2016

Another trip to France, another shawl...

...another river cruise, in fact, courtesy of Great Rail again. A relaxing week sitting on a riverboat looking at the scenery floating past and eating lovely food. Comfortable trains there and back - what more could one ask for?

Bordeaux from the river
View from the top of the citadel at Blaye

During the week I all but finished the shawl I started a couple of months ago. Did the last few rows on the way home and cast off on Sunday, when we were back. 

Knitting on the boat


The finished 'Silverleaf' shawl
So it's had its soak in Eucalan and is now happily sitting under a towel to dry. This was taken before the top set of towels went on, but the contrast isn't great because I've put a pale grey shawl on top of a white towel.


Thursday, 4 August 2016

Back from Bristol

Time for another post - I really don't know where the months go!

I'm just back from the wonderful Topsy Turvy Bristol Conference on children's literature. Everyone else seems to have taken lots of photos, but I only have one, that was emailed to me - you'll see why in a minute.

My talk was the first - 9.45 on Saturday morning, so it was good to get that out of the way and be able to enjoy the rest of the time ... but that wasn't the real beginning of the weekend, which started as Mr Bufo and I walked round to the station on Friday morning for me to catch the 10.54 Great Malvern train. I'd already got my ticket - an advance one at the ridiculously low price of £9.90 return, so I couldn't use any other than the train shown on the ticket. And I had a reserved seat - or so I thought. 

The train was late - by about 10 minutes when it got to Romsey, but picked up a little bit as it went on. My seat was occupied by a lady who also had a ticket with that seat number on, and as the card in the back of that seat had the details of her journey, I found another - facing the direction of travel, which I prefer anyway, that had no reserved ticket, and so we progressed.


I did a bit of knitting - the scarf I had nearly finished, which did get completed over the weekend, though I only have a photo of it half-done:

During the journey I had texts from Gill and Alison, whom I was due to meet at Temple Meads, on their own progress towards that destination, and when I tried to respond, found I was out of signal for a long stretch between Bradford-on-Avon and Bath, but was finally able to update them that I was almost there. 

Came out from the station to find them on the forecourt, and we progressed to the bus stop. Only a minute or so later hte bus arrived, and we were en route to the River Cottage Canteen.

A group of us from all over had arranged to have a late lunch there, which was great, then our cases took the seats of those who had been cooped up in cars all morning, and more than half a dozen of us walked from the restaurant across Durham Down to Wills Hall, where it was all about to happen.

The weekend was as well-organised and interesting as it always is, and the penultimate speaker was Jen, who is 'JS' on a certain forum. She and I had promised to include Cestina and Elder from that forum in a hug, so, thanks to Emma who took the pic on Jen's phone - here we are, wishing the other two could have been with us as well. Maybe next time? The dates for 2018 are 27-30 July if you want to mark your diaries now!




Saturday, 5 March 2016

Marching on ...

Just a quick update - still no probate but signs that it won't be much longer; hoping buyers are happy to wait another couple of weeks. 

In the meantime, I haven't touched the yarn I showed in the February post, because I've been seduced by Mystical Lanterns and show some of my motifs below: 



These were the first three and so each of the twelve colours has been used once. Then all the balls go back into a bag and get picked 'blind' to give a different selection for the next three 'lanterns'













And here are all twelve colours, plus the thirteenth, joining colour - the pale peachy one at top right




Also finished a pair of socks (as always, 2-at-a-time and toe-up) from this pattern - sock yarn bought in Lille last summer.

Sunday, 7 February 2016

February falals

So as 2016 has well and truly begun, the 'Christmas card' post needs replacing...

Mum's bungalow is finally cleared, and we hope will soon be sold. The work on reprints continues, and so does the knitting and crochet - a recent trip to meet friends in Salisbury yielded a rather good value pack of different colours of yarn, so another blanket is in the offing:


Have done a test square - though not yet sure of the exact pattern I'll use - with some stash yarn...



Sunday, 5 July 2015

More knitting ... and other things

Another several months have slipped by, and I sometimes think all I've done is knit .. and watch a bit of tennis on the box ... oh, and edit a couple more reprints. Life seems quite full at the moment despite this seeming inertia, so no apologies for the hiatus in blog posts. 

Instead, some pictures of what I have achieved!


 EJO Society Publications
The February title

 EJO Society publications
The June title 

The blanket completed in June 

The April cat for an April baby

The June cat for the Cleeve weekend raffle



...and the bottom three of these 4 pairs of socks


So I haven't actually been idle!

And TMOH is much better now; thank you to everyone who has asked.

Sunday, 1 February 2015

Kaffghan Blues

I've spent January trying to finish the Kaffe Fassett/Rowan Knit-along. I was up-to-date all along with the actual knitting, but events conspired against me during the sewing-up.  Then TMOH went for some tests. Nothing we didn't already know about showed up, but his reaction to one of the procedures was horrifying and could have even been life-threatening. This was compounded by the fact that he reacted badly to the antibiotic they gave him 'in case' he got an infection. Ten days on, he is on the mend, with a different antibiotic - he's had to stop another of his regular meds while on this, as it is contra-indicated! - but with one thing and another I have missed the deadline for Rowan's competition. All the sewing-up was finished last night - and if 31 Jan had been the deadline, as originally indicated, I might just have made it, but they made the deadline 30th, so no chance. And I have still to do a trim, so I can't with all honesty say it is finished yet.

But here it is in its current state...I have sewn all the ends in - the rogue piece of yarn peeking out from under the edge of the blanket is actually from a spare ball of wool under the sofa! [and the length on the arm of the sofa leads to the ball I'm working the trim with...]





And here it is with crochet edging on the spare bed.



Monday, 22 December 2014

All Good Wishes for Christmas and the New Year



I have been very remiss this year and not posted anything like as often as I should have - I will try to be a better girl next year. But we will be very busy [not in the Chalet School sense!] planning TMOH's 'Big Birthday' celebration for next August, so I don't know whether this will get fitted in. I have been busy knitting - according to the gadget on Ravelry, nearly 7 miles of yarn have gone through my fingers this year. 






You've seen the cardigan, jumper and cats already, but two blankets and most of the squares for another one have also been completed, and a goldfish called Solon [you can see some of the squares for the current blanket behind him].


All good wishes to everyone for Christmas 2014 and New Year 2015

Sunday, 29 June 2014

The Rout[er] of the Problem

I know, I know, I should have updated this long ago! But it isn’t all my fault – although some of it is … our router was playing up – or so we thought, and I went into our local computer specialist – who has just moved from a top floor above the local St John’s Ambulance to an ancient outhouse behind an old pub. The gist of what I said to them was, “You sold us a router x years ago, and I’m not sure it’s doing what it should, can you sort it out?” and the gist of what they said – very fairly I thought – was “See if your ISP will check it/change your deal, as that often includes a new router.”

So I looked on line at the offers our ISP were making now, and discovered that I could get more speed and fewer usage restrictions for less money, so I contacted them and organised the switch. And sat back to wait for a new router. Which didn’t come. And still didn’t come until, after several phone calls, just before we went to Switzerland.

So it wasn’t until after we’d got back that we could assess the new router. And the old one was better! The new one didn’t have the oomph to reach TMOH’s computer downstairs, whereas the old one did, and we still had, and continue to have, problems with the line dropping out. But it’s better than it was, so although it isn’t yet a perfect system, I have no excuse for not posting on the blog.

I’m not going to put everything that I’ve been doing up now, but as both bits of the family for whom I have knitted toys have safely produced their baby boys (about 7 weeks apart) I will just show the twin striped cats I made for them.



The rest of what I’ve been up to must wait for another day … 

Wednesday, 29 January 2014

Knitting placeholder

I really mustn't leave a Christmas /New Year message up beyond the end of January, so this is just to show you what I've one since last summer. Not as much, as I might have wished. I had about 3 months where I couldn't knit! Frustration doesn't begin to describe my feelings...I had a funny lesion on the side of my right middle finger, and could't knit at all, couldn't type properly, and even buttons and tying shoelaces became a real problem. There was a dressing of some sort on the finger from July until early November, first my own attempt of an ordinary plaster when it first came up and kept bleeding messily on anything and everything, then a professional sausage-like finger-covering that the nurses kept renewing for what seemed like weeks after the GP excised the excrescence itself. Eventually it needed cauterising too, and I was able to finish the jumper I had started in June:



Dark Grey cable jumper
I really was glad to get the cable jumper finished! TMOH had chosen the yarn, and it was pure wool, and good to handle ... but such a dark colour that it was very wearing on the eyes, so in the dark autumn and winter evenings, I was only able to attack it in short bursts. During November, just after my dressing had finally come off the finger and I had restarted work on the jumper, I met some friends in Salisbury. After lunch we landed in the wool shop - as you do! And I rather fell for Sirdar's new yarn, Gisellle. So I bought a book of patterns specifically for it - it's aran weight - and sufficient yarn to make any of them I fancied, once I was free of the grey cables. 



Beginnings of cardigan in Giselle 131
Every so often I would go and look at my bag of soft purply-pink, blue and cream yarn, and tell myself that I could start on it as soon as the grey cables were finished. 

Finally, just after the New Year, the jumper was done, and I could make a start on something for myself. I decided on a cardigan, and this photo is from when I was 50 rows up both body and sleeves. It's a raglan pattern, so I'm doing the tops of both body and sleeves all together, with a couple of purl stitches to denote the 'seam' line and save having to sew in the sleeves afterwards. I'm more than twice as far on as this now, but I haven't taken another photo yet.  





Finished cardigan - and scarf, that I had enough yarn for as well