It seemed a good idea to start with ... rather than search my cookery books for inspiration, I'd just do the soup Mrs Redboots had posted on her blog the previous day.
It would make a change after two days of cold meat and undisguised* leftover veg followed on the third evening by a mild curry-ish sort of thing using some of the spicy mix that the Udder Farm Shop sells - displaying it in fragrant bowls, with sturdy brown-paper bags and little metal scoops to play at being old-fashioned grocers with, as you serve yourself Magic Majhala** or Regal Red Sea mixes.
Anyway, soup was called for, and at first glance I had everything on the list. So yesterday afternoon, for last night's meal, I extracted some chicken carcase stock from the freezer, and began to assemble the other ingredients.
I only had 2 carrots, but then I was only making soup for the 2 of us, so that didn't worry me. I had escallions [banana shallots] and used 3 of them rather than 2 onions; I added a couple of small turnips that were looking reproachfully from the veg shelf, and after much searching - we've not long had our kitchen completely redone, so some things are in logical but not easily found places - found the tag end of a packet of red lentils - probably about 100-150g worth.
I used a little bit of dripping to soften the chopped shallots, as we'd had rib of beef for our Christmas main meat, and it had produced a small basinful. Then I added the diced carrot and turnip to the pot for a few more minutes, and rinsed the lentils under the tap. Some old habits die hard, and I'm old enough to remember when one had to rinse, and pick over, lentils for grit; these days they are meant to be OK straight from the packet. Once everything was stirred together, I added the block of frozen stock, about half a pint, and filled the plastic box it had been frozen in with water from the tap, and poured that in - twice - making about a pint and a half of added liquid.
I kept stirring until the frozen stock had melted, and brought it all to the boil, then left it simmering for a couple of hours.
I ventured into the dank garden and returned with very small trophies - a couple of sprigs of thyme and a few marjoram leaves. Once these were washed, I bruised the thyme and added it to the pot.
Mrs Redboots had said she used asafoetida as she didn't have any garlic to hand. Not having any asafoetida, nor ever having knowingly tasted it, I was confident I had plenty of garlic. Well once upon a time it was plenty ... but it was growing out, and the cloves themselves had got soft and rubbery. So I chopped the growing shoots together with some Greek basil that I have on the kitchen windowsill, ready to stir in at the last minute.
A quick taste about half an hour before serving showed the need for a bit more seasoning. As 'Magic Majhala' has a few lentils amongst its many ingredients, I added about a teaspoonful of that and stirred it well in; mild curry flavours go well with lentils and carrots.
Our G had been sitting on a slice of lime for a good hour by now, so we added ice-cubes, and the T, and relaxed for a while with this and a few of the beautiful olives [from Olives Direct] that we get from our local market.
Just before serving, I used a potato masher to break down the cubes of vegetable without losing texture. I'd thought about using the stick blender, but decided I didn't really want this to be a 'cream soup' - a decision approved by TMH when I put the bowl in front of him - and stirred in the chopped herb/garlic shoots mixture.***
So I'm afraid, Annabel, that it wasn't really your soup at all - but it was jolly nice!
______________
* Chopped up and fried in dripping, but still obviously sprouts, chestnuts, roast potatoes, carrots and parsnips.
** I'm not sure of the spelling of this, as the last lot we bought didn't have the proper printed label, just a hand-written 'Magic'.
*** For once something I had pre-chopped did not lurk on the chopping-board to confront me when I came back to the kitchen after the course for which it was intended ...
__________________
Random thoughts - on words: spoken, read or written; stitches: knitted, crocheted or sewn ... and anything else that comes into my head.
Sunday, 30 December 2012
Friday, 21 December 2012
Winter Solstice
Well, it seems the world did not end at 11:11 this morning; and so I return, as every year, to this poem by my favourite living author, Susan Cooper.
The Shortest Day
And so the Shortest Day came and the year diedAnd everywhere down the centuries of the snow-white world
Came people singing, dancing,
To drive the dark away.
They lighted candles in the winter trees;
They hung their homes with evergreen;
They burned beseeching fires all night long
To keep the year alive.
And when the new year's sunshine blazed awake
They shouted, revelling.
Through all the frosty ages you can hear them
Echoing behind us - listen!
All the long echoes, sing the same delight,
This Shortest Day,
As promise wakens in the sleeping land:
They carol, feast, give thanks,
And dearly love their friends,
And hope for peace.
And now so do we, here, now,
This year and every year.
― Susan Cooper
![]() |
| Winter sunshine on the hill behind Halsway Manor, Somerset |
Thursday, 29 November 2012
What a Shower [but I can't use it yet!]
We're nearly there! Y finished work last night. Everything is in, except that we need to go and get a new loo roll holder tomorrow, as the old one really doesn't suit the room as it now is.

But the outside waste pipe has been replaced - we knew it was split, and had been leaking into the carport for ages - and we can't run any water into the top hopper until the jointing has dried ... so I still can't have a shower until tomorrow morning.
It's a good job we were away in France last weekend, staying in a hotel with beautiful facilities, or you'd be beginning to smell us from wherever you are!!
So here are a few pictures of what things look like now ...

[We still need to get a new blind, too]

Update Friday - still haven't got the blind, but we successfully purchased a new bathroom cabinet and loo roll holder. We should be able to get them fitted over the weekend, with a bit of luck...and I did have a lovely shower this morning!!
Wednesday, 21 November 2012
A Night on the Tiles
Just a short post tonight, to say that things are moving on. After a bit of fiddling and final fitting in place of the vanity unit - although it had been plumbed in, it wasn't properly fixed yesterday - Y started tiling. That bit doesn't look any different from yesterday, so I haven't taken another picture. He's done quite a bit of tiling, but I won't reveal a whole wall until things are entirely finished ... must keep some surprises up my sleeve.


Because it was crucial where certain elements went , I missed my Pilates class today, in order to be here to set him on the right datum line.
[Don't tell my Pilates teacher, but in the end I would have been able to get there and back in time, but I didn't want to risk him starting in the wrong place, and he thought he'd be starting the tiling about an hour before he actually did.]
Anyway, there are a few more days before he'll have finished everything, but I shan't post again now until I can show you the completed room. [We have chosen our wall colour, by the way, and will reveal that at the same time!]
Edit, morning of 22 Nov., to add that the cistern leaked/overflowed in the night, so suspect he'll need to sort that before any more tiling gets done today ...
Anyway, there are a few more days before he'll have finished everything, but I shan't post again now until I can show you the completed room. [We have chosen our wall colour, by the way, and will reveal that at the same time!]
Edit, morning of 22 Nov., to add that the cistern leaked/overflowed in the night, so suspect he'll need to sort that before any more tiling gets done today ...
Tuesday, 20 November 2012
Now Wash Your Hands...
We have a working loo and handbasin!
After collecting the new loo seat, Y went to get connectors for the new tap. Wouldn't you think all taps nowadays would be metric? Especially with a continental-sounding name like Grohe. Not a bit of it! The diameter of the hoses leading into this tap is three-eighths of an inch! So instead of being able to pick up the usual connectors to go between the isolators and the tap hoses, Y had to go to a specialist plumbing supplies to get four connectors - to connect the metric pipe isolators to a short length of pipe, and then to 'convert' that pipe to the size of the hoses feeding the tap.
That done, Y arrived here and set about actually fitting the loo. When you see a back-to-the-wall loo in a hotel en-suite, you don't think much about it. You probably notice in some of the more modern, or more recently converted hotels, a door between rooms that evidently leads to a 'service room' that gives access to the back of all the plumbing.
When you have a vanity unit fitted, that gives a shelf above the loo, and a cupboard under the basin, you don't really think about how it will go in. The large waste pipe from the loo has to be fitted, but to manoeuvre the pan into place - after fitting the seat! - at the same time as connecting the cistern to the flush feed at the back of the pan, whilst holding the cistern and getting the cold feed into the cistern connected before the cistern itself can be put on its housing and the lid put on ... I think an octopus would have been hard pressed to come up with enough arms.
But it's in, and it works.
Tomorrow the tiling begins.
After collecting the new loo seat, Y went to get connectors for the new tap. Wouldn't you think all taps nowadays would be metric? Especially with a continental-sounding name like Grohe. Not a bit of it! The diameter of the hoses leading into this tap is three-eighths of an inch! So instead of being able to pick up the usual connectors to go between the isolators and the tap hoses, Y had to go to a specialist plumbing supplies to get four connectors - to connect the metric pipe isolators to a short length of pipe, and then to 'convert' that pipe to the size of the hoses feeding the tap.
That done, Y arrived here and set about actually fitting the loo. When you see a back-to-the-wall loo in a hotel en-suite, you don't think much about it. You probably notice in some of the more modern, or more recently converted hotels, a door between rooms that evidently leads to a 'service room' that gives access to the back of all the plumbing. When you have a vanity unit fitted, that gives a shelf above the loo, and a cupboard under the basin, you don't really think about how it will go in. The large waste pipe from the loo has to be fitted, but to manoeuvre the pan into place - after fitting the seat! - at the same time as connecting the cistern to the flush feed at the back of the pan, whilst holding the cistern and getting the cold feed into the cistern connected before the cistern itself can be put on its housing and the lid put on ... I think an octopus would have been hard pressed to come up with enough arms.
But it's in, and it works.
Tomorrow the tiling begins.
Monday, 19 November 2012
Still Looless!
I knew it was tempting providence to say 'one more night...' In fact I thought as I posted yesterday's blog that it really was asking for trouble. The trouble started when Y arrived this morning, as when he tried fitting the vanity unit in its eventual position, the water feed pipes were too far out into the room, so he had to move them to get it back against the wall.Then he realised that he needed to do part of the bath panelling before he could fit it in anyway, as there would be no way to get to it once the unit was in place. He's making the bath panel, at my suggestion, from vertical 'planks' of the flooring material, which will look much better than a plastic moulded panel. It will also allow a door in the panel at the tap end, to get to the isolators if we ever need any work done in future.

This afternoon I went out for a massage. After an hour of blissful relaxation I returned. Another problem. The loo seat broke as Y was fitting it. It is - naturally [!] - of a kind that needs to be fitted before the loo itself is plumbed in.
So ... another night of plodding downstairs ... I won't attempt to prophesy whether it will be the last. Latest photos from this evening, after he had gone. You can at least see progress! The one at top right shows a bit of the bath panelling.
[You may need to click on the picture to get a clearer view - I've just realised this is possible!]
Sunday, 18 November 2012
How [not?]to get a new bathroom
When we had the kitchen redone about 18 months ago, the two men
who did the work made such a good job of it that I asked them for a rough quote
for the bathroom, ‘when I was ready to have it done.’
About a month ago, I emailed the one whose contact details I
had, and 2 or 3 weeks ago, the other one rang me to say that ‘X’ [the first bloke]
was now spending most of his time in France - where he’s renovating a ‘ruin’ –
but if I was happy for himself, ‘Y’, to do the work, he would come and look and
give us a proper quote. So on Tuesday the week before last, he came and
measured up, did some sums, and his figure was within budget, so we said, 'Fine, let's go ahead.'
'Well we're away all next week,' I said jokingly.
'Well, actually...'
It turned out there was a problem with the job he was
supposed to be doing last week, so he could do us then! So we spent the next
couple of days choosing bath, taps and shower, either from the catalogue he had
with him, or via various internet sites and OK-ing by email various things from
emailed pics. Then we zoomed up to Salisbury to look at tiles & flooring,
which we successfully purchased and brought home ourselves, together with shade
cards for paint.
We then spent the weekend clearing access in the loft for
him to sort out the electrics for the shower, and taking down the wall cabinet
and towel rails before he arrived on Monday morning, when we were setting off
for a week’s folk dancing in Somerset.
So he arrived as arranged, and we left him chipping off
tiles, and the electrician he had organised sorting out the power feed to the new
shower. Before we left there was already a slight problem…the plasterer he had
booked for Tuesday texted him to say he couldn't come until Wednesday. So he
rang another plasterer he had worked with before, who couldn't come Tuesday
either, but ‘definitely’ could do Wednesday, so Y texted plasterer A back and
cancelled him. And we set off to Somerset with light hearts [and bank balances,
having paid him for all the materials and fittings!]
Tuesday passed, and Wednesday, and we thought
everything must be going to plan. But on Thursday Y rang. Plasterer B had let
him down. And by the time he got back to plasterer A, he had arranged another
job, so Y was going to keep trying to get someone, but he was afraid we wouldn't have a usable bathroom when we got home on Friday…


I think he was more bothered than we were. We have a downstairs cloakroom; so although it is further to go in the middle of the night, at least we have somewhere to go. And having been brought up in the days when bathing was a weekly occurrence, daily ablutions in a small washbasin is no great hardship either, for a few days at least, so we came home in a far less worried frame of mind than Y was in.
He’d done a lot of preparatory work. The new bath was in situ and plumbed in; the shower was
on the wall; the new flooring was down; the largest irregularities of the walls
filled. All was ready for a plasterer – and he’d found one who was willing to
work on a Sunday, as a special favour. So today Y arrived at 9.30 with plasterer
C, who spent the day giving us a lovely smooth ceiling and walls. Meanwhile Y
replaced the exterior waste bathwater pipe, and prepared and fitted the new
door.
Only one more night, now, of having to go downstairs in the middle of it; tomorrow the
first thing he does will be to fit the new loo, then the washbasin, so that on
Tuesday the newly skimmed walls should be fit to take the tiles.
We need to
decide fairly urgently on the colour for the un-tiled wall area, as – which we hadn't thought
of before – he will need to have that done before the towel rail goes up, as we’ll
never get behind it properly once it’s in place.
The before [on the left] and during [on the right] pictures will show you the state of what
we came back to on Friday, and what it was like by Sunday afternoon.
The rest of the saga, and the final appearance – to follow...when it happens!
Labels:
bathrooms,
decorating,
loos,
paint,
plasterers,
tiles
Subscribe to:
Posts (Atom)








